Need Power?

We mine 8–40% more usable grid capacity from existing infrastructure — and deliver it to the companies that need it most!

Exclusive U.S. Rights

Deployment Nationwide

Data Center & Utilities

EPRI Verified Savings

Our Business

The Challenge: AI data center load growth is outpacing grid infrastructure. Interconnection queues and upgrade costs are delaying projects by 18–36+ months.

The Solution: RPEWest unlocks 8–40% more usable capacity on existing infrastructure through customer-funded Non-Wires Alternatives (NWAs). We find savings using our process with OmniPower™ installations at local high-load facilities; utilities recognize the savings in their IRP and DSM portfolio.

Key Advantage: Backed by independent 2024 EPRI Power Quality Program testing that demonstrated PF correction to 0.96–0.98 across multiple sites, enabling a streamlined M&V plan and faster utility approval, interconnection, & buildout costs for data center develpers.

Proven Capacity Unlocked for AI Expansion

Real impact across every sector of America's Energy Infrastructure

Data Center Developers

Faster build-out, lower operating bills, and bypass grid queues with real capacity gains.

Scale faster with freed capacity and lower energy costs from day one.

Public Utilities Commission

Equitable power distribution across regions without rate hikes for residents.

Manage demand without infrastructure expansion or customer rate increases.

Industrial & Commercial Facilities

8-40% energy savings plus measurable carbon reduction for sustainability goals.

Reduce operating costs and meet carbon reduction targets simultaneously.

The Electrical Grid

Real megawatts returned nationwide as a non-wires alternative to new power plants.

Deploy proven technology to scale America's energy capacity sustainably.

Our Process

  • You share location + scaling plan.

  • We map constrained-circuit high-load neighbors.

  • OmniPower™ corrects to 0.98 PF at no cost to hosts.

  • Savings are verified using EPRI-validated streamlined M&V.

  • Utility grants reduced system-upgrade costs and accelerated timelines under large-load tariff or special contract.

  1. Consultation →

  2. Power Map →

  3. Installation OmniPower™ →

  4. Verified Savings →

  5. Utility benefits→

  6. Accelerated timelines for Interconnection→

Mining Grid Power with OmniPower™

The utility recognizes the freed MWs in its Integrated Resource Plan (IRP) and DSM portfolio, granting the hyperscaler reduced system-upgrade costs and/or accelerated interconnection study timelines under its large-load tariff or a special NWA contract.

brown and gray metal part close-up photography
brown and gray metal part close-up photography

Proven Results

Real projects. Real savings. Real impact.

28% Bill reduction at Commvault Data Center after deploying OmniPower™

Commvault

16 MW Capacity Relief provided to Con Edison substation network

Con Edison

2,847 Facilities using OmniPower™ for grid capacity release.

National Grid

Ready to scale your next Data Center project?

Schedule a confidential capacity assessment for your target site. First evaluation is free.

Official Licensee of OmniPower™
Contact

Info@RPEWest.com

(800) 123 456

Scottsdale, AZ

Navigation

Home

About Us

Services

Request Consultation

© 2026 RPEWest. All rights reserved.